Flush mounting installation
Masonry work and installation: basic procedures
The Problem:
- How to carry out the masonry work, lay conduits, wire the system and install the control and lightning devices correctly in a typical apartment with view to saving time during the initial installation, subsequent maintenance and enable the installation to be extended in future if necessary.
The Answer:
- Use the right tools, follow the instructions as illustrated.
- We recommend the use of Gewiss53 products which have been specially designed and co-ordinated to facilitate the work of the installer.
- In a particular manner, for flush installations, the 50 AC Range shows black heavy flexible insulating conduits (floor installations) and RAL 7035 grey light flexible insulating conduits (wall installations).

- Before commencing. Consult the Gewiss handbook.
- Mark out the wall installation.
- Make channels
- Position the flush mounting junction box

- Lay a conduit in the channel
- Cover the channel with mortar

- How to hold electrical shears correctly.
- cut flush conduits with the junction box
- Pull through the cables with the aid of a cabling probe
- Connect cables to electrical device, following the instructions carefully. N.B. The connection to the earth circuit with yellow/green cable must not be carried out for class luminaries

- How to wire a single pole one-way switch
- Fix the switch onto the support
- Press the plate onto the support until it clicks into place
- the plate may be removed using appropriate tools.
Gewiss. 1996. Handbook Basic Application Gewiss (English). Bergamo: Gewiss spa, pp. 10-11
THIS UNIT’S QUOTE:“The important thing in life is not the triumph but the struggle.” – Pierre de Coubertin
THEORY: Grammar review: Expressing cause-effect relationships. Patterns of means and end/purpose. Patterns of reason and result.Comparatives. Developing skills.
RECOMMENDED SITES:
- Adverb Clauses - Cause and Effect Relationships (http://a4esl.org/q/h/mb/adv_cause.html)
- Establishing Cause & Effect (http://www.socialresearchmethods.net/kb/causeeff.php)
TASKS
- What is the gist of the above text? [Maximum 50 words]
- Spot technical terms and find out their Spanish equivalent, so as to enlarge your assigned lexicon glossary on Construction Engineering / Quantity Surveyor. By the end of this week you should have between 210 and 350 new terms.
- Structure of the text: follow up the paragraph-structure and identify what aspects are dealt with in each of them. How does this paragraph-arrangement respond to the text purpose and textual coherence?
- Textual analysis. Identify hedges (matizadores), connectors, passive constructions (conversion into active), gerund and infinitive verbs (why?), compound-words, Present Perfect Tense (why?), causal phrases (to result in, to cause, etc.).
- Watch the following You Tube video-clip: «German Coast guard trainee» (http://www.youtube.com/watch?v=yR0lWICH3rY) and then answer the questions below:
- Where does the joke lie? Is there any pun (play-on-words)?
- Compare with the video-clip on Week 2 (The Italian who went to Malta). What seems to be the problem?
53. GEWISS: ↩